The Reserve Vault

During the Reserve Vault project, we performed glass and panel installation works during active construction.

The building was an ongoing development with glass and panel installation works in progress. Installation activities were carried out using rope access and boom lifts to reach the required areas.

Our team performed the glass and panel installation works through rope access and boom lift methods as part of the active construction phase.

The installations were completed according to the required placement and alignment, fulfilling the intended scope of works.

Building Type Vault and Storage
Height 6 Storeys
Scope Installation Work, Rope Access
Access Method Rope Access & Boom Lift
Duration 24 Weeks
Location Changi South, Singapore